Prairie Village Kitchen Remodel – Week-By-Week – Week 4

  • Home
  • /
  • Blog
  • /
  • Prairie Village Kitchen Remodel – Week-By-Week – Week 4

Last updated on September 22, 2023

This post is part of an ongoing project. Check out what happened last week right here!

This week was all about the cabinets! After Sam discovered an existing problem with the gas system and got it fixed for the homeowners,  Joe and Eric joined the project and helped him begin the cabinet install. The team began the install on Thursday, and by Monday most of the Cabinets were installed. These photos were taken on Monday.

Kitchen Cabinets
Kitchen Cabinets

 

 

 

 

 

 

After a quick mid-week break for some inspection work, the team got back to finishing the cabinets, and even moved on to installing the original crown molding and trim.

Crown Molding
Kitchen Cabinets with Crown Molding

 

 

 

 

 

 

It was amazing how quickly the cabinets came together, and with the cabinets installed, the homeowners’ vision began to take shape. Next week, it will be time to focus on the flooring, and begin work on the new half bath.


Click to see the Before Floor Plan  
                  Click to see the After floor Plan

 

[code-snippet name=”disable-blog-feature-image”]