20150817_094123_resized (1)Check out what happened last week right here.

The electrical has now been run on our outdoor pergola to include locations for two hanging chandelier fixtures and two osculating wall mount fan units. These will add the evening ambiance and comfort for a summer evening.

Brick has been installed in a decorative pattern to infill the cut patio slab cutting that was required for piers at the existing arbor legs. A new brick stoop was built to the height of the French door location adjoining the existing sidewalk and patio area.

20150902_075935_resized (1)Half round copper gutters are strapped to the roofing to maintain the open look of the beam structure and will ultimately patina to a warm tone to match the stain of the roofing. The cedar siding has been installed at the windows and matches the existing detailing of the cedar and stucco style of the existing home.

We’ve put the final touches on the pergola as well, including new hardwood flooring, lighting and trim work. All these final details have been completed and with a few touch ups we will be ready for Grandpas 90th birthday party this coming weekend.

Stay tuned for the final reveal as we wrap up the interior details and present our final photo shoot!

This is part of an ongoing remodeling project administrated by Donna Kirsopp, design consultant.

Donna Kirsopp, CKBA has been with the SDR team since 1999 and in the industry since 1982. Donna has been recognized by NARI and KCH&G as an award-winning designer for 15 consecutive years. “ I am so fortunate to get up every morning loving  what I do.” Donna, a native of Pittsburgh PA, has one grown daughter. “ In my spare time you can find me in my garden or on the golf course.”

20150817_094020_resized (1) 20150817_094037_resized (1) 20150902_075839_resized (1)

[code-snippet name=”disable-blog-feature-image”]