One-Week Bath: Round 2

This is a photo of our lead carpenter, Ted Kincaid, working on installing a tile floor in one of our bathroom remodels.

This complete, custom bathroom remodel was completed in 6 days in an 80+-year-old house.  This is the second One-Week Bath bathroom we have completed for this homeowner.

A troubled tub

In this before picture, you can see a really dated jetted tub. This tub was never used because the first time it was turned on the water turned black from the residual that was in the jets—YUCK! The white tile tub deck and backsplash, as well as the polished brass hardware (that has oxidized), makes this tub replacement a must.